Renovation + retrofit
Document accessible existing geometry before design development, coordination, selective demolition, or field fabrication.
Decisions before devicesAPPLY / 07
The best application is not simply a place that can be scanned. It is a project decision that improves when the team has a coordinated record of accessible conditions.
Application logic
A useful scope identifies the decision, capture boundary, field constraints, coordinate basis, review method, output, and receiving software before mobilization.
01 / USE CASES
Six common paths
Document accessible existing geometry before design development, coordination, selective demolition, or field fabrication.
Provide coordinated spatial reference for congested rooms, overhead systems, risers, plant areas, and tie-in planning.
Capture equipment, structure, clearances, and interfaces so design and fabrication teams can evaluate existing constraints.
Supply reviewed geometry around connection points and work zones when off-site fabrication needs stronger existing-condition evidence.
Build a spatial record for maintenance planning, space analysis, asset context, and future projects within a defined information scope.
Plan capture around access windows, public operations, scale, elevation changes, occlusions, and data-volume constraints.
Fit test
Next coordinatePROJECT / SCOPE